01
Floors
Old floor up, a level and quiet new one down.
- 01We lift the old tiles or carpet and take them away.
- 02We level the base so nothing creaks or rocks.
- 03An acoustic underlay goes down, for the neighbours below.
- 04We lay, trim and finish, skirting included.
- How long
- 4 to 6 days for a flat this size
- You pick
- Wide-plank oak. Warm and calm. Planks up to 2.2 m long, matte oil finish.



















